Recently, Dingli Group's coal slime drying production line project in Huangling, Shaanxi has successfully completed installation and commissioning, and is about to enter the formal production stage.
The construction of the Huangling coal slime drying production line began at the beginning of last year. After several months of intense construction, the equipment installation and commissioning work was finally completed. This production line adopts advanced hot air drying technology, which can efficiently process coal slime, improve energy utilization efficiency, reduce pollution emissions, and meet modern environmental protection requirements.
During the project construction process, Dingli Group adhered to the concepts of "technological innovation" and "green development", and adopted internationally leading drying technology and intelligent control systems, which not only greatly improved production efficiency, but also significantly reduced energy consumption. After the project is completed, it is expected that the annual processing volume of coal slime can reach hundreds of thousands of tons, injecting new impetus into regional economic development.
The commissioning of the Huangling coal slime drying project can not only effectively solve the problem of coal slime resource waste, but also further assist local energy conservation and emission reduction work.
As the end of the year approaches, the Huangling coal slime drying production line is about to open a new chapter. This is another brilliant report card handed in by Dingli Group in 2024. Continuously launch more high-quality products and services to contribute to the development of my country's new energy and environmental protection cause.
【Location】: shaanxi
【Capacity】: 2000t/d
【Location】: Shanxi Shuozhou
【Capacity】: 1000t/d
【Location】: Shanxi Youyu
【Capacity】: 1000t/d